Qynetic OEE
How does Qynetic OEE show where a machine loses time?
In short
Qynetic OEE shows how much scheduled production time a machine turns into good parts at its ideal rate. Availability, performance and quality help locate a loss. The team can then inspect stops, cycles or rejects for the same machine and shift to decide where to act.
The problem it addresses
Two machines can have the same OEE even when one waits for setups and the other runs slowly. Combining them in one percentage hides which team needs to act and which records to examine.
How it works
- 1Choose the machine and shift. Check the scheduled production window, its run time and the ideal cycle time for the article actually being produced.
- 2Review the three factors. Stopped time affects availability, slower running affects performance and rejected units reduce quality.
- 3For an availability loss, group stops by reason and compare their total duration. Review uncoded events with the operator. For a performance loss, check cycle records and the reference cycle time.
What to check in the records
Shift comparison
Use the same shift boundaries and scheduled-time rules when comparing machines or days. A break included in only one shift can create an apparent loss.
Stops and reasons
Look at accumulated duration and event count. A recurring short interruption can cost more time than the longest single stop.
Counts and cycle times
Compare good, total and rejected counts with the reference cycle for the product. A counter reset or the wrong cycle time can distort the factors.
Relevant data
- Shift schedules
- Cycle and stop events
- Article cycle times and reject counts
Common questions
How is OEE calculated?
Multiply availability (run time divided by scheduled production time), performance (ideal cycle time times total count divided by run time) and quality (good count divided by total count). Use counts and times from the same production window.
Does a stop reason prove the root cause?
A reason code tells the team how the stop was classified. Compare the event time with operator notes, setup activity or a service record before choosing a remedy.
Related reading
5 min read
OEE explained: availability, performance and quality
How Overall Equipment Effectiveness is calculated, with a worked example, the classic loss categories, and why explaining losses matters more than the percentage.
Read article6 min read
Kaizen explained: continuous improvement on the shop floor
What kaizen means, the principles behind it (gemba, PDCA, standard work, waste), how daily kaizen differs from a kaizen event, and how it combines with Six Sigma.
Read article
Related modules
Qynetic Quality
Examine individual measurements, control-chart signals and the evidence behind a capability index.
Learn moreQynetic Planner
Explore how order sequence, machine eligibility and inspection capacity affect a production schedule.
Learn moreQynetic Maintenance
Weigh an asset’s condition and service history against an upcoming stop and the next order.
Learn more
Book a call about your factory
Tell us what you make and which machines you run, and we will walk through how Qynetic fits. If you would rather get news and early access, join the waitlist.