Line OEE has stayed below target for several weeks
A line misses its overall equipment effectiveness (OEE) target. Shift reports show occasional long setups and scrap, while operators also report frequent short stops.
How it works
- Pick one machine, product and shift. Compare its run time with scheduled production time, its output with the ideal cycle rate, and its good count with the total produced.
- In this example, setup stops total 20 minutes and short interruptions total 12. Six scrapped parts at an ideal cycle time of 30 seconds each represent another three minutes of lost output.
- Setup is the largest of these three losses. Use the stop log and the operator's shift notes to check what happened during those 20 minutes before changing the setup procedure.
How to interpret the result
Check how the line classifies short stops so that the same minutes count only once. If much of the loss has no reason code, review those events with the shift team before prioritising an improvement.