Skip to content

Qynetic Factory Memory

What would Factory Memory show about a previous run?

In short

Factory Memory is Qynetic’s model for a traceable production history. The workspace is on the product roadmap. Its starting point is a question such as what changed on the last run of an article. The answer needs a linked revision, machine, intervention and measured outcome with an identifiable source.

The problem it addresses

A handover note may say that changing an insert solved a diameter problem. A later team needs the tool position, revision, measurements and conditions before and after the intervention to decide whether the same action makes sense today.

How it works

  1. 1Identify the run using the article, revision, machine and lot or order reference. Preserve the source record for each relationship.
  2. 2Link the intervention to measurements before and after it. Include their unit, timestamps and inspection method so another engineer can reproduce the comparison.
  3. 3When considering an earlier setup, check whether the drawing revision, material and cutting conditions match. Mark any gap that prevents the team from drawing the same conclusion.

What to check in the records

  • A relationship with a source

    The model can represent an article produced on a particular machine and attach a measured outcome to that relationship.

  • An intervention in context

    A change record identifies what was done. The next inspection adds evidence of what happened afterwards.

  • A comparable earlier run

    The highest recorded Cpk can come from a different revision or measurement window. Check the underlying series before carrying a setting forward.

Relevant data

  • Article and revision references
  • Machine and tool identities
  • Inspection and intervention records
Integrations

Common questions

Where can I find the inspection history for a lot?

Start with CIM’s lot report. It assembles the released revision, recorded measurements, corrections and linked quality events. Those are examples of source records that a wider production history could cite.

Can a recorded outcome establish a root cause?

A measured improvement after a change establishes a sequence. Review other changes in the same interval and compare with similar runs to judge whether the intervention explains the outcome.

Book a call about your factory

Tell us what you make and which machines you run, and we will walk through how Qynetic fits. If you would rather get news and early access, join the waitlist.