Skip to content

Example scenario

Which drawing and instruction applied to this batch?

Answer from the revision references on the batch and inspection records. Include the applicable instruction and measurements so the customer can follow the evidence.

A customer asks which drawing was used for a batch

A customer asks how a batch was inspected. A newer drawing is already in circulation, and the quality engineer needs the revisions tied to that production run.

How it works

  1. Open the lot record in CIM. It groups the measurements by instruction revision and shows the limits used to judge each characteristic.
  2. Match the revision references with the released instructions and drawings. Expand the results to see the operator, equipment and any corrections recorded for each reading.
  3. Check the lot record for open quality events and unresolved results. Print the record or export it as CSV or JSON. Wider links from articles and tools to outcomes are on the Factory Memory roadmap.

How to interpret the result

If the lot contains two revisions, report the results under each one. A corrected measurement retains the original reading as well as its replacement. Resolve any missing revision reference before drawing a conclusion about that result.

Book a call about your factory

Tell us what you make and which machines you run, and we will walk through how Qynetic fits. If you would rather get news and early access, join the waitlist.