Qynetic CIM
How does CIM trace an inspection to its drawing revision?
In short
Qynetic CIM gives operators a released instruction, a drawing and the characteristics to inspect. Each recorded value retains its revision and the limits used to judge it. When a customer asks about a lot, the quality engineer can trace the result back to that inspection.
The problem it addresses
A revised drawing may be in force when a customer asks about last month’s batch. The engineer needs the inspection criteria the operator saw at the time, including any later corrections to the record.
How it works
- 1An engineer marks the characteristics on a drawing, specifies limits, methods and inspection frequency, then releases an instruction revision.
- 2At the station the operator selects the released instruction, identifies the run and enters a value or a pass/fail result. Capture the lot ID to support later retrieval.
- 3Open the lot report for the relevant revision. Check the characteristics, measurements, corrections, equipment entries and linked quality events before exporting the supporting records.
What to check in the records
Revision history
A release preserves a snapshot. Changing the limits on a later revision leaves the criteria used for an earlier measurement available for review.
Reading a scanned drawing
Enter dimensions by hand or use optional text recognition (OCR) in the browser. Check each proposed value against the drawing before adding it to the instruction.
Inspection at the station
The operator sees where to measure on the drawing and which checks are due at the current part count.
Lot record (eDHR)
The report brings together the records captured for the lot. A corrected reading stays in the history so the reviewer can follow the change.
Relevant data
- Released instructions and drawings
- Station entries and measurement imports
- Lot identifiers
Common questions
Can the report show a corrected measurement?
Yes. The lot history retains the original entry and its correction. The superseded entry is excluded from the result.
What if a lot spans more than one revision?
Review each revision represented in the lot’s measurements. Cite the references from the records for the affected operations and reconcile any missing links before answering the customer.
Related reading
5 min read
What is an EDHR (Electronic Device History Record)?
What a device history record is, what it typically contains, why revision control and traceability are central, and how electronic records help in regulated manufacturing.
Read article6 min read
Traceability in manufacturing: lots, serials, genealogy
What traceability is, the difference between forward and backward tracing, what a production genealogy contains, how to test it, and why connected data makes it fast.
Read article
Related modules
Qynetic Quality
Examine individual measurements, control-chart signals and the evidence behind a capability index.
Learn moreQynetic Planner
Explore how order sequence, machine eligibility and inspection capacity affect a production schedule.
Learn moreQynetic Factory Memory
Trace a previous run through the article, machine, tool and measurements that support its recorded outcome.
Learn more
Book a call about your factory
Tell us what you make and which machines you run, and we will walk through how Qynetic fits. If you would rather get news and early access, join the waitlist.