Platform
Which Qynetic module fits the production question?
Qynetic is a manufacturing intelligence platform organised by site and machine. A shift leader can start with lost production time in OEE. A quality engineer can start with the inspection revision in CIM and examine the resulting measurements in Quality. The same machine identifier helps both teams find records from the run in question.
Availability
Qynetic opens to manufacturers in turn. OEE is the first module; the others follow. Join the waitlist or book a call to see where each stands.
Find out what changed on a shift
Use OEE for stops, cycle times and rejected parts. Use Quality when the question is about a measured characteristic. Factory Director ranks open recommendations for the team to review alongside those records.
Qynetic Factory Director
Review open recommendations in order of severity, together with the evidence behind each one.
Learn moreQynetic Quality
Examine individual measurements, control-chart signals and the evidence behind a capability index.
Learn moreQynetic OEE
Separate downtime, slow cycles and rejected parts, then inspect the shift records behind the loss.
Learn more
Trace an inspection or a tool correction
CIM records which inspection revision applied. Tool Manager shows the wear offsets read from a machine position. APC prepares a correction file for named approval when a Q-DAS result explicitly requests an adjustment.
Qynetic APC
Review an offset request against the machine’s latest readings and approve the exact values for a file hand-off.
Learn moreQynetic Tool Manager
Find the tool in a machine position and compare its recorded wear offsets over time.
Learn moreQynetic CIM
Release inspection instructions and trace a lot’s measurements to the revision used at the operator station.
Learn more
Prepare a schedule or revisit an earlier run
Planner, Maintenance and Factory Memory are on the product roadmap. Their pages describe the records needed to assess a changeover, fit service into a production stop or compare an earlier setup with the next job.
Qynetic Planner
Explore how order sequence, machine eligibility and inspection capacity affect a production schedule.
Learn moreQynetic Maintenance
Weigh an asset’s condition and service history against an upcoming stop and the next order.
Learn moreQynetic Factory Memory
Trace a previous run through the article, machine, tool and measurements that support its recorded outcome.
Learn more
From one finished part to shift OEE
At 11:42:18, machine M70-01 finishes a part. Select a stage to follow the reading through this example shift.
Explore the full platform map
Sources
- Machines and PLCs
- Connected to Qynetic Edge
- Measurement systems
- Connected to Qynetic Edge
- Vision and inspection
- Connected to Qynetic Edge
- Material flow (AMR, trays)
- Connected to Qynetic Edge
- Manual stations
- Connected to Qynetic Edge
Existing systems
- MES
- Connected to Qynetic Edge
- ERP / order system
- Connected to Qynetic Edge
- Other existing systems
- Connected to Qynetic Edge
Edge
- Qynetic Edge
- Connected to Machines and PLCs, Measurement systems, Vision and inspection, Material flow (AMR, trays), Manual stations, MES, ERP / order system, Other existing systems, Event log
Core
- Event log
- Connected to Qynetic Edge, Manufacturing model, Factory Memory, Customer systems (API)
- Manufacturing model
- Connected to Event log, Analysis layer
- Analysis layer
- Connected to Manufacturing model, OEE, Quality, APC, Tool Manager, CIM, Planner, Maintenance, Factory Memory, Factory Director, Customer systems (API)
Modules
- Factory Director
- Connected to Analysis layer, OEE, Quality, APC, Planner, Maintenance, Tool Manager, Factory Memory, Engineers and managers, Operators
- Quality
- Connected to Analysis layer, Factory Director, APC, CIM, Engineers and managers
- APC
- Connected to Analysis layer, Factory Director, Quality, Tool Manager
- Tool Manager
- Connected to Analysis layer, Factory Director, APC, Maintenance
- CIM
- Connected to Analysis layer, Quality, Customer systems (API)
- OEE
- Connected to Analysis layer, Factory Director, Planner, Operators
- Planner
- Connected to Analysis layer, Factory Director, OEE, Maintenance, Operators
- Maintenance
- Connected to Analysis layer, Factory Director, Planner, Tool Manager, Engineers and managers
- Factory Memory
- Connected to Analysis layer, Factory Director, Event log
People and systems
- Operators
- Connected to OEE, Planner, Factory Director
- Engineers and managers
- Connected to Maintenance, Quality, Factory Director
- Customer systems (API)
- Connected to CIM, Event log, Analysis layer
Book a call about your factory
Tell us what you make and which machines you run, and we will walk through how Qynetic fits. If you would rather get news and early access, join the waitlist.