Qynetic Planner
Which scheduling decisions does Qynetic Planner address?
In short
Planner is on Qynetic’s roadmap for scheduling production against actual shop-floor constraints. Consider a rush order competing for a lathe. The planner needs the operation sequence, qualified machines, setup time and first-piece inspection slot to decide whether moving it will still meet the promised date.
The problem it addresses
A free machine slot can look long enough for an order even though the required tool is in use elsewhere or the first-piece inspection falls after the shift. Starting the job then can delay both it and the order that was moved.
How it works
- 1List the order operations, dependencies and due date. Include setup and inspection time alongside cutting time.
- 2For each eligible machine, check the released revision, available tooling, material and any service window. Identify which constraint first prevents the job from starting.
- 3Compare the original and revised sequence against both orders’ due dates. The production planner can use that comparison when deciding whether to move the job.
What to check in the records
Order sequence
A downstream operation has to wait for its predecessor. Moving one operation earlier can free a slot on one machine while creating a queue on another.
Usable capacity
Check tooling and inspection availability for the same time period as machine capacity. A spare lathe with the wrong setup is a different scheduling option.
Changeover window
Estimate the time to change the tool, set up the next job and verify the first piece. Compare that total with the available stop.
Relevant data
- Order routings and due dates
- Shift and service calendars
- Tool and inspection availability
Common questions
Which records are useful for a scheduling review?
Bring one real order sequence with operation times, eligible machines and a conflicting order or service task. Add any limits on tooling or inspection so the team can test whether the alternative sequence is feasible.
Does this workflow release an order back to ERP?
The example ends with the planner’s scheduling decision. Order release and any connection to the site’s ERP depend on the workflow agreed for that deployment.
Related modules
Qynetic Tool Manager
Find the tool in a machine position and compare its recorded wear offsets over time.
Learn moreQynetic OEE
Separate downtime, slow cycles and rejected parts, then inspect the shift records behind the loss.
Learn moreQynetic Maintenance
Weigh an asset’s condition and service history against an upcoming stop and the next order.
Learn more
Book a call about your factory
Tell us what you make and which machines you run, and we will walk through how Qynetic fits. If you would rather get news and early access, join the waitlist.